Innpower

Innisfil, Ontario

The wood elements of the Innpower offices (formely Innisfil Hydro) were realized by Timmerman Timberworks. The project includes the design of the wood-wood and wood-steel connections, the machining of the glulam and cross-laminated timber (CLT) as well as the erection of the structure. A total of 30 m3 and 184 m3 of Nordic Lam and Nordic X-Lam products were used, respectively.

Owner

Innpower

Architecture

MCL Architects

Structure

Moses Engineers

Distribution

Timmerman Timberworks

Completion

2014